The Shira route is another path that approaches Kilimanjaro from the west, and it is nearly identical to the Lemosho route. In fact, Shira was the original route and Lemosho is the improved variation. While Lemosho starts at Londorossi Gate and treks through the rain forest to Shira 1 Camp, the Shira route bypasses this walk by using a vehicle to transport climbers to Shira Gate, located near the Shira Ridge.
On the first day on the mountain, climbers begin their hike from 11,800 feet (3,600 m) and spend their first night at the same elevation at Simba Camp. Then, the route merges with Lemosho and follows the southern circuit route. Although Shira is a varied and beautiful route, Lemosho is recommended over Shira due to the high altitude of Shira's starting point. It is possible that climbers will experience altitude related symptoms on the first day due to failed acclimatization. Climbers using Shira should be confident of their ability to acclimatize.